Benefits of integrating BIM Level 2 with the project

The design is considered as the most vital phase of any project and the design should be proper prior to go ahead is the basis for smooth delivery and successful completion. Throughout initial planning phases, manufacturers and specialists can provide a wide array of benefits.

With collaboration, main contractors and architects can establish technical and estimating support as well as get benefitted from manufacturers’ consultancy and increasing knowledge of products and methods currently available that would fulfill the requirements of main contractor’s like offsite solutions or alternative materials.

Involving all related parties at design phase develops a collaborative approach from the beginning. Dealing with all the options obtainable to them, and getting manufacturers to participate in initial technical meetings, signifies the plan of the project on the whole is more up to date. Devoid of proper feedback at the conceptual and developmental design phases, the design during…

Read more